PolyPeptide Industries - GMP-ISO7 Laboratory

Research & Development (R&D)

Torrance, CA

Lundstrom & Associates Architects provided programming and laboratory planning and schematic design through construction phase services for this 975 S.F. GMP ISO 7 lyophilization production laboratory. The ISO 7 containment is in and out from the production area. The project includes an interstitial mezzanine and a separate roof structure platform for chiller, condensers, and heat pumps.

Additional services included: Construction cost estimate; design development; construction documents and observation; documentation of existing conditions; and consultant coordination for structural and M/E/P engineering.